Summer 1998 Construction:
The Hawks' field is laid in place.

In early August of 1998, construction began on the Hawks new football field.
The sound of revving engines and the sight of rising dust was a sign of more to come.

An overhead view of the Hawks football field.
The sight was formerly the home to the Saint Anselm men's and women's soccer teams,
which moved to a refurbished Melucci Field.

Construction crews sift through tons of soil to lay the new field.

A ground's eye view from the corner of the south end zone.

The Hawks field as it appears from above left field at the Hawks baseball field.

Sewage systems appeared in mid-September.
This view comes from behind the north end zone.

A state of the art irrigation system was installed in September.

A view of the field from the future home of one of two main ticket gates.